The bridge on the Easenhall Road is due for repair this winter. That road will be closed from 22/01/2015 until 08/04/2015. Diversion signs will be in place. The bridge is to be strengthened and will be able to carry 18 Tonnes in the future. The bus service along that route will also be reinstated.